Electrolytic Ion Ground Electrode Installation Guide

  • company name:
  • Updated:
  • location:
  • Production address:
  • Views:
  • Hangzhou Zhihong Lightning Protection Technology Co., Ltd.
  • 2016-11-23 15:13:40
  • Ningbo City
  • 2570

I want to inquire

【a brief introdction】

Electrolytic ion grounding electrode has stable grounding performance, obvious resistance reduction effect, good acid and alkali resistance and corrosion resistance, long service life, and is a maintenance-free and long-lasting resistance reduction grounding device.

【Detailed description】

Electrolytic ion grounding electrode has stable grounding performance, obvious resistance reduction effect, good acid and alkali resistance and corrosion resistance, long service life, and is a maintenance-free and long-lasting resistance reduction grounding device. Ion ground electrode production standard basis: 1. National Standard of the People's Republic of China: "Building Lightning Protection Design Code" GB50057-94. 2. Ningbo Besuda Petrochemical Equipment Co., Ltd. Enterprise Standard: "Electrolytic Ion Grounding System" Q / KF001-2004 3. The electrolytic ion grounding system meets the requirements of China's power, communications, petrochemical and other industries grounding standards. 4. The electrolytic ion grounding system meets UL and N.

施工指南Electrode ion ground electrode construction guide :

Larger projects can use vertical construction; small projects are recommended to be buried horizontally (inclination angle is generally 15-30 degrees), which can reduce construction costs and the effect is not affected.

1.Drilling

@ 1 Drill a 160mm × 3.5m vertical ground hole in the selected construction site.

@ 2 If it is in a rock zone or a large ground network, if vertical deep well grounding is used, multiple ion electrodes can be connected vertically (Taike exothermic welding), such as 4 as a group to form an ion ground electrode with a depth of 12m. At this time, a hole of the corresponding depth needs to be drilled.

@ 3 If it is a small project or the conditions are not convenient for drilling, you can dig a trench with a width of 400mm, a narrow width of 3.5mm, a length of 3.5m, and a depth of not less than 800mm.

@ 4 If it is a multiple grounding system, you need to select multiple locations to drill holes. The lateral distance between the holes is twice the total length of the electrode, which is generally 6 meters. A trench for horizontal connection of electrodes needs to be dug between the holes, with a width of 400mm and a depth of not less than 600mm.

2.Implant the ground electrode and connect the lead

@@ 1 Peel off the tape that seals the moisture absorption hole on the upper end of the electrode and the ion release hole on the lower end of the electrode (don't forget!);

@@ 2 The electrode is implanted into the hole, and the lead-out wire is connected. It can be connected with rust-proof bolts. It is recommended to use Taike fire mud welding (exothermic welding), which is widely used internationally.

@@ 3 In the case of multiple electrode networks, the electrodes need to be connected to each other. The horizontal connecting wire can be 95mm2 copper stranded wire or galvanized round steel or galvanized flat steel. The welding method is the same as above.

3. Prepare electrode filler and fill it into the hole

@@@ 1 Mix the external filling material with water in a ratio of 1: 1 and stir well until it is a paste.

@@@ 2 Inject the matched filling material around the ground electrode to 50mm above the top of the ground electrode; be careful not to leave air in the hole and affect the close contact between the filler and the electrode. You can use a bamboo pole or a wooden stick to insert the hole Fill the filler and shake it up and down to allow air to come out.

@@@ 3 If it is buried horizontally, the prepared external filling material can be applied around the ion electrode.

4.Check the connection and backfill the soil

@@@@ After the above work is completed, check the reliability of the connection. After confirming that it is correct, fill it with soil until it is flush with the ground, and compact it in layers during the filling process. Be careful not to carry stones, sticks, plastic, etc. in the backfill.

5.Measure the ground resistance

@@@@@ Generally, the initial measurement of the ground resistance can be performed 3 days after the electrode installation is completed. After that, the ground resistance can be retested one month and six months later to observe the change of the ground resistance. It can be found that the ground resistance shows a gentle downward trend.

Message box
Interested product: *
Message content: *
Your Name: *
Your unit: *
contact number: *
Common mailbox: *
Address:
province: *
Verification code: * = Please enter the calculation result (fill in Arabic numerals), such as: three plus four = 7
product search

Please input product keyword:

contact details
Address: Room 501-1, Gate 2, Building 2, No. 10 Liansheng Road, Wuchang Street, Yuhang District, Hangzhou
Postcode: 315201
Contact: Chen Ting
Message: Online message
Shop: http://www.fashionpho.com/st45314/
| Shop Home | Company Profile | Products | Latest Supply | Company News | Inquiry Message | Contact Us | Member Management |
http://www.fashionpho.com Design and production, transcript without permission will be investigated. Copyright (C) http://www.fashionpho.com , All rights reserved.
The above information is provided by the enterprise itself, and the authenticity, accuracy and legality of the information content is the responsibility of the relevant enterprise. Http://www.fashionpho.com does not assume any responsibility for this.
Tips: In order to avoid purchasing risks, it is recommended that you confirm the supplier's qualification and product quality before purchasing products.
QR code

Scan to visit mobile station